DIVISION
01 - GENERAL REQUIREMENTS
|
 |
 |
01
11 00.00 99
|
02/09 |
SUMMARY
OF WORK |
| |
|
This
medium scope specification covers requirements for basic description
and special administration instructions of the selected project |
| |
|
|
|
|
|
|
|
|
SUBMITTAL
PROCEDURES |
| |
|
This broadscope
section covers data, normally submitted for review, to establish
conformance with the design concept, Affirmative Procurement/EPA
Regulations, and the contract documents |
| |
|
|
|
|
 |
 |
01
35 43.00 99 |
02/09 |
ENVIRONMENTAL
PROCEDURES |
| |
|
This
guide specification covers the requirements for environmental
protection , safety, and Affirmative Procurement. general information. |
| |
|
|
|
|
 |
 |
01
42 00
|
01/09 |
SOURCES
FOR REFERENCE PUBLICATIONS |
| |
|
This section
contains the listing of organizations whose publications are referenced
in other sections of the specifications |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
02 - EXISTING CONDITIONS
|
 |
 |
02
42 51.00 99 |
01/09 |
CARPET
REMOVAL AND RECLAMATION |
| |
|
This guide
specification covers the procedures for removal and reclamation
of used carpet, including EPA Affirmative Procurement requirements
and Carpet America Recovery Efforts (CARE) |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
06 - WOOD, PLASTICS, AND COMPOSITES |
 |
 |
06 71 33.00 99 |
01/09 |
FIBERGLASS REINFORCED PLASTIC (FRP) LADDERS |
| |
|
This guide specification covers fiberglass reinforced plastic (FRP) ladders |
 |
 |
06 73 01.00 99 |
01/09 |
FIBERGLASS REINFORCED PLASTIC (FRP) GRATING |
| |
|
This guide specification covers fiberglass reinforced plastic (FRP) gratings |
 |
 |
06 82 14.00 99 |
01/09 |
FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE RAILINGS |
| |
|
This guide specification covers fiberlass reinforced plastic (FRP) pipe and tube railings |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
07 - THERMAL AND MOISTURE PROTECTION |
 |
 |
07
52 00.03 99
|
01/09 |
MODIFIED
BITUMINOUS MEMBRANE ROOFING (CCAFS/PAFB ONLY) |
| |
|
This
guide specification covers modified bitumen sheet roofing. Hot
mopped asphalt,[ torch applied,] hot air, and cold-applied adhesive
applications are included. Both SBS and APP modified bitumen membranes
are included |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
08 - OPENINGS
|
 |
 |
08 22 20.00 99
|
01/09 |
MODIFIED BITUMINOUS MEMBRANE ROOFING (CCAFS/PAFB) |
| |
|
This guide
specification covers fiberglass reinforced plastic (FRP) doors and frames |
| |
|
|
|
|
 |
 |
08
41 13.00 99
|
01/09 |
ALUMINUM-FRAMED
ENTRANCES AND STOREFRONTS |
| |
|
This
section covers aluminum entrances, glass and glazing, and door
hardware and components |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
21 - FIRE SUPPRESSION
|
 |
 |
21 22 00.00 99
|
01/09 |
CLEAN AGENT FIRE EXTINGUISHING |
| |
|
This
guide specification covers dry pipe fire protection sprinkler systems |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
22 - PLUMBING |
 |
 |
22 05 83.00 99
|
01/09 |
CURED-IN-PLACE PIPE (CIPP) LINING |
| |
|
This guide specification covers cured-in-place pipe lining |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) |
 |
 |
23 01 30.41 99
|
01/09 |
HVAC SYSTEM CLEANING |
| |
|
This
guide specification covers the requirements for cleaning of HVAC
systems |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
31 - EARTHWORK
|
 |
 |
31 63 29.00 99
|
01/09 |
DRILLED CONCRETE PIERS AND SHAFTS |
| |
|
This
guide specification covers the procurement, installation, and testing of drilled concrete piers and shafts |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
33 - UTILITIES |
 |
 |
33 01 99.00 99 |
01/09 |
SLIP LINING OF EXISTING PIPING |
| |
|
This Guide Specification covers procurement, installation, and testing of slip lining for existing exterior piping |
| |
|
|
|
|
 |
 |
33
05 23.13 99
|
01/09 |
UTILITY
HORIZONTAL DIRECTIONAL DRILLING |
| |
|
This guide
specification covers the requirements for directional drilling systems,
equipment, piping and procedures |
| |
|
|
|
|
| |
|
|
|
|