DIVISION
01 - GENERAL REQUIREMENTS
|
 |
 |
01
11 00.00 99
(01110J) |
12/06 |
SUMMARY
OF WORK |
| |
|
This
medium scope specification covers requirements for basic description
and special administration instructions of the selected project. |
| |
|
|
|
|
|
|
|
12/06 |
SUBMITTAL
PROCEDURES |
| |
|
This broadscope
section covers data, normally submitted for review, to establish
conformance with the design concept, Affirmative Procurement/EPA
Regulations, and the contract documents |
| |
|
|
|
|
 |
 |
01
35 43.00 99
(1355J) |
12/06 |
ENVIRONMENTAL
PROCEDURES |
| |
|
This
guide specification covers the requirements for environmental
protection , safety, and Affirmative Procurement. general information. |
| |
|
|
|
|
 |
 |
01
42 00
(01420) |
11/06 |
SOURCES
FOR REFERENCE PUBLICATIONS |
| |
|
This section
contains the listing of organizations whose publications are referenced
in other sections of the specifications |
| |
|
|
|
|
 |
 |
01
57 23.00 99
(01356J) |
11/06 |
TEMPORARY
STORM WATER POLUTION CONTROL |
| |
|
Temporary
construction measures most used in complying the Best Management
Practices of the storm water pollution prevention plan as required
by a NPDES Permit. |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
02 - EXISTING CONDITIONS
|
 |
 |
02
41 00.00 99
(02220J) |
11/06 |
DEMOLITION |
| |
|
This
broadscope section covers the demolition, dismantling, reconditioning
and disposal of existing building materials, equipment and utilities |
| |
|
|
|
|
 |
 |
02
42 51.00 99 |
11/06 |
CARPET
REMOVAL AND RECLAMATION |
| |
|
This guide
specification covers the procedures for removal and reclamation
of used carpet, including EPA Affirmative Procurement requirements
and Carpet America Recovery Efforts (CARE). |
| |
|
|
|
|
 |
 |
02
83 00.00 99
(13283J) |
11/06 |
LEAD
REMEDIATION |
| |
|
This
guide specification covers the requirements and procedures for
limiting occupational and environmental exposure to lead when
removing lead-based or lead-containing paint (LBP/LCP) |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
07 - THERMAL AND MOISTURE PROTECTION |
 |
 |
07
01 60.71 99
(07001J) |
11/06 |
FLASHING
AND SHEET METAL REHABILITATION |
| |
|
This
broadscope section covers wood blocking and furring for masonry
walls; wood nailers and blocking for roof fascias, flashing, and
cants; wood framing; rough bucks for openings in masonry walls;
wood framing for architectural casework and equipment; dressed
wood grounds to receive plaster and other finish materials |
| |
|
|
|
|
 |
 |
07
52 00.03 99
(07550J) |
11/06 |
MODIFIED
BITUMINOUS MEMBRANE ROOFING (CCAFS/PAFB ONLY) |
| |
|
This
guide specification covers modified bitumen sheet roofing. Hot
mopped asphalt,[ torch applied,] hot air, and cold-applied adhesive
applications are included. Both SBS and APP modified bitumen membranes
are included |
| |
|
|
|
|
 |
 |
07
72 00.00 99
(13220J) |
12/06 |
ROOF
ACCESSORIES |
| |
|
This guide
specification covers the requirements for fall arrest anchors |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
08 - OPENINGS
|
 |
 |
08
17 43.00 99
(08550J) |
11/06 |
INTEGRATED
COMPOSITE DOOR OPENING ASSEMBLIES |
| |
|
This guide
specification covers the requirements for fiberglass reinforced
plastic doors and frames |
| |
|
|
|
|
 |
 |
08
38 19.00 99
(08325J) |
11/06 |
RIGID
TRAFFIC DOORS |
| |
|
This section
covers monolithically (one piece) formed, insulated, high impact
industrial traffic door systems |
| |
|
|
|
|
 |
 |
08
41 13.00 99
(08410J) |
11/06 |
ALUMINUM-FRAMED
ENTRANCES AND STOREFRONTS |
| |
|
This
section covers aluminum entrances, glass and glazing, and door
hardware and components |
| |
|
|
|
|
 |
 |
08
87 15.00 99 |
11/06 |
SOLAR
CONTROL SAFETY FILM |
| |
|
This section
covers transparent film at least 0.10 mm (0.004 inch thick (4 mil))
applied to the interior side of glass to reduce solar heat gain,
spalling, and fragment dispersal |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
09 - FINISHES
|
 |
 |
09
56 00.00 99
(09251J) |
11/06 |
TEXTURED
CEILINGS |
| |
|
This
guide specification covers the requirements for "popcorn"
spray texture finish gypsum products |
| |
|
|
|
|
 |
 |
09
65 13.13 99
(09651J) |
11/06 |
RESILIENT
BASE |
| |
|
This
guide specification covers the requirements for Resilient Wall
Base and Resilient Stair Treads |
| |
|
|
|
|
 |
 |
09
84 00.00 99
(09520J) |
11/06 |
ACOUSTIC
ROOM COMPONENTS |
| |
|
This
guide specification covers the requirements for fabric covered
acoustical wall panel systems |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
12 - FURNISHINGS
|
 |
 |
12
51 00.00 99
(11670J) |
11/06 |
OFFICE
FURNITURE |
| |
|
This
guide specification covers the requirements for interior consoles,
credenza, and mapboard systems |
| |
|
|
|
|
| |
|
|
|
|
 |
DIVISION
13- SPECIAL CONSTRUCTION |
 |
 |
13
61 21.00 99
(02907J) |
11/06 |
MAP
BOARD SYSTEMS |
| |
|
This broadscope
section covers dynamic display (Map Board) systems and operator
console systems |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) |
 |
 |
23
40 00.00 99
(15810J) |
11/06 |
HVAC AIR CLEANING
DEVICES |
| |
|
This
guide specification covers the requirements for cleaning of HVAC
systems |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
26 - ELECTRICAL |
 |
 |
26
33 53.00 99
(16610J) |
11/06 |
STATIC
UNINTERUPTIBLE POWER SUPPLY |
| |
|
This
section covers three-phase continuous duty, on-line, solid state
uninterruptible power systems |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
27 - COMMUNICATIONS
|
 |
 |
27
13 23.00 99
(16127J) |
11/06 |
COMMUNICATIONS
OPTICAL FIBER BACKBONE CABLING |
| |
|
This
guide specification covers the requirements for single made (SM),
multimode (MM) or mixed optical fiber cable for outside plant
telecommunications |
| |
|
|
|
|
 |
 |
27
15 00.49 99
(16714J) |
11/06 |
INTERMEDIATE/RADIO
FREQUENCY COMMUNICATIONS HORIZONTAL CABLING |
| |
|
ISO
9001 approved Master Multipoint Radio Station facilities |
| |
|
|
|
|
| |
|
|
|
|
DIVISION
33 - UTILITIES |
 |
 |
33
05 23.13 99
(02740J) |
11/06 |
UTILITY
HORIZONTAL DIRECTIONAL DRILLING |
| |
|
This guide
specification covers the requirements for directional drilling systems,
equipment, piping and procedures |
| |
|
|
|
|
| |
|
|
|
|