March 6, 2003Updated NASA Masters were released on the SpecsIntact web site. These changes will appear on the CCB disc #61, to be released in April.March 27, 2003SpecsIntact 4.0.530 was released by the development team for download. The introduction of SI4 ushers in some of the most signicant changes in the history of SpecsIntact, including the debut of the fully redesigned Editor.April 21, 2003SpecsIntact 4.0.548 was released by the development team for download and for release on CCB disc #61.June/July, 2003Updated NASA and NASA KSC Masters were released on the SpecsIntact web site. View change document for NASA or KSC.July 22-23, 2003The SPECSINTACT Interagency Configuration Control and Coordinating Board, made up of representatives from NASA, NAVFAC and USACE, met in Washington, DC. The Board convenes regularly to review requests for changes in the software and set the priorities and direction for the design of the system. See the SI-CCCB meeting minutes.July 24-25, 2003The NASA SPECSINTACT Interagency Configuration Control and Coordinating Board, made up of representatives from most NASA centers, met July 24-25 in Hampton, VA. The board meets regularly to consider changes to the NASA Construction Guide Specifications (Master Text). See the NS-CCCB meeting minutes.September 15, 2003SpecsIntact 4.0.571 was released by the development team for download.October 3, 2003SpecsIntact 4.0.576 was released by the development team for download and for release on CCB disc #62. View release notes.November 4-5, 2003The NASA SPECSINTACT Interagency Configuration Control and Coordinating Board, made up of representatives from most NASA centers, met November 4-5 at the Kennedy Space Center, FL. The board meets regularly to consider changes to the NASA Construction Guide Specifications (Master Text). See the NS-CCCB meeting minutes.
|
|
||